7/24
SANY0741.jpg SANY0746.jpgThumbnailsSANY0742.jpgSANY0746.jpgThumbnailsSANY0742.jpgSANY0746.jpgThumbnailsSANY0742.jpgSANY0746.jpgThumbnailsSANY0742.jpg

Now you need to put all of the 12mm nuts back on. Torque them slightly over stock settings. I suggest about 20-25 ft lbs. Because of the hondata spacer and the casting of the manifold I was unable to put the top center nut back on as the threads wouldnt c - Now you need to put all of the 12mm nuts back on. Torque them slightly over stock settings. I suggest about 20-25 ft lbs. Because of the hondata spacer and the casting of the manifold I was unable to put the top center nut back on as the threads wouldnt catch. I will later grind this a bit in order to get it to fit on there. Also here Ive started putting everything back together. PVC/catch can line, the valvecover breather, and fuel lines.